At the end of June the PROPAV team that works at the São Sebastião Terminal (TEBAR), concluded the maintenance services and delivered the TQ-63100-04 Tank for TRANSPETRO’s operation. Customer satisfaction with the work performed by PROPAV was reflected in the monthly evaluation, through the Performance Evaluation Bulletin (BAD), in which PROPAV obtained a score of 99 out of 100. The engineer in charge for the contract, Carlos André, points out that the work in this equipment were conducted simultaneously, on an urgent basis, with a short and challenging deadline. He also emphasizes that the inspection body of the contract congratulated the team for achieving the objectives with respect to safety and quality.
PROPAV highlights and congratulates the quality and commitment of the TEBAR construction team!